Boiler Accessories from Lakewood Instruments
|
Boiler Sensor SR2
The SR2 is used for monitory conductivity in a boiler blowdown line. The SR2 cannot be used after a sample cooler.
The SR4 can be in the boiler blowdown line or with a sample cooler. The SR4 can only be used with the 2250 and 2255.
MBV1 and MBV2
PL5
The PL5 is used as a sample/cycle method in boilers. The orifice restricts flow near the boiler sensor to prevent steam flashing during a sample. The PL6 can also be used as a PL5. PL6
The PL6 is used for a continuous sampling of a boiler. The lower orifice bleeds a small sample across the sensor. The upper orifice is used with the motorized ball valve and opens when the conductivity is above set point. |





